STRUCTURE
R.C.C. framed structure to withstand wind & seismic loads as per IS code with RCC walls
2 Basements + Ground + 24 Upper Floors in RCC.
Type of Construction – Aluminium Form Work.
Seismic Zone II Complaint.
CAR PARKING:
Stack parking provision wherever feasible (Optional).
DOORS
Main doors: Engineered hard wood frame with designer shutters polish finished on both sides/as per design.
Internal doors: Engineered hard wood frames with designer shutters with enamel paint finished on both sides/as per design
French doors: UPVC/ Aluminium door systems with sliding shutters with mosquito mesh.
Windows: UPVC / Aluminium window systems with safety grill (M.S) with mosquito mesh
All Hardware of reputed make
PAINTINGS
External: Textured /smooth finish and two coats of exterior emulsion paint.
Internal: Smooth putty finish with two coats of premium emulsion paint for walls.
FLOORING
Ground Floor Lobby: Full Body Vitrified tiles / Granite flooring.
Staircases/Corridors: Full Body Vitrified tiles / Granite flooring.
Living, Dining, all Bedrooms & Kitchen: Double charged vitrified tiles.
Bathrooms: Ceramic / vitrified tile flooring.
All Balconies/Utilities: Antiskid ceramic tiles.
Dadoing in Kitchen: Glazed ceramic tiles dado up to 2’ height above kitchen platform.
Bathrooms: Glazed ceramic tile dado up to 7 feet height.
Utilities: Tiles dado up to 3' Height.
Stilt: Cement concrete with smooth finish.
HAND RAILING
Balcony: M.S railing
Staircase (common area): M.S railing
KITCHEN
Provision for softened water outlet.
BATHROOMS
Wall mounted EWC
Sanitary: Parry ware or Vitra or equivalent make.
C.P Fittings: Grohe or Jaguar or Hind ware or equivalent make.
ELECTRICAL
Concealed copper wiring of Havells or polycab or equivalent make.
Modular switches: Philips / Anchor or equivalent make.
Power outlets for air conditioners in Master bedroom.
Power outlets for geysers and Exhaust Fans in all bathrooms.
Power outlets in kitchen for Hob, chimney, refrigerator, microwave oven, mixer and washing machine in utility area.
Power supply for 3 BHK: 5 KW, 2 BHK: 4 KW.
DG backup for 3 BHK: 5 KW & for 2 BHK: 4 KW.
100 % DG backup power for Lifts, Pumps & lighting in common area.
PLUMBING
Drainage/sewage: PVC pipes & fittings
Water supply (Int & Ext): Cpvc or Upvc pipes & fittings
TELECOM/INTERNET/CABLE TV
Provision for internet, DTH, telephone & intercom.
LIFTS
Passenger Lifts & 1 Service Lift (Schindler or Equivalent make)
WTP AND STP
Softened water made available through an exclusive water treatment plant.
Sewage treatment plant of adequate capacity as per norms will be provided inside the project, treated sewage water will be used for the landscaping / flushing purpose.