STRUCTURE
RCC Framed structure using Aluminium Form Work
COMMON AREA - FLOORING
Walting lounge, reception, GF lobby & lift lobby: Granite & Vitrified Tiles
Staircases: Concrete step tiles, Vitrified tiles
Other lift lobby and corridors (upper): Vitrified tiles (Matt Finish)
APARTMENT UNITS - FLOORING
Living, Dining, Family & Foyer: Vitrified tiles
Master Bedroom, Other Bedrooms & Kitchenette: Vitrified tiles
Balcony / deck: Matt finish tiles
Master Bedroom Toilet & Common Toilet: Anti-skid ceramic tiles
WALL DADO
Master Bedroom Toilet & Common Toilet: Ceramic tile cladding up to false ceiling height
KITCHEN
Counter: Provision for modular kitchen
Plumbing & Electrical: Plumbing point provision for water purifier, washing machine
Electrical points provision for water purifier, refrigerator, hob, chimney, mixer/grinder, Microwave Oven & Washing Machine
WINDOWS
UPVC / Anodised Aluminium with mosquito mesh provision
DOORS
Main entry door - to unit: Flush shutter with both side Laminate and architrave
Bedroom doors: Engineered & Treated Hardwood frame & particle board with both sides laminate and architrave
Toilet door: Engineered & Treated Hardwood frame, Shutter laminated both sides and architrave
Balcony door: UPVC / Aluminium with bug screen 2 track with one side fixed panel
Shaft door: MS door frame with mild sheet shutter
TOILETS
CP Fittings: Jaquar / Ess Ess / Essco or equivalent
Sanitary fixtures: Floor mounted white EWC (Hindware/Parryware/ Cera or equivalent) with exposed flush tank of standard make including health faucet
3 BHK Comfort: Wall mounted WC with exposed cistern
3 BHK Urban: Wall mounted WC with exposed cistern
Accessories: Towel rod
False Ceiling: Grid ceiling Calcium silicate or equivalent
PAINTING & FINISHES
Accessories: Combination of External texture paint with external grade emulsion
Internal ceilings & common area: Oil Bound Distemper or Emulsion
Unit ceiling: Acrylic emulsion paint
Internal walls, common area & lift Lobby: Emulsion paint
Staircase, utility area and service area: Oil bound distemper
Basement: Cement paint
Unit walls: Acrylic emulsion paint
Steel works: Synthetic enamel paint
Woodwork: Enamel paint
ELECTRICAL
3 Bedroom Apartment: 5 KW
2 Bedroom Apartment: 4 KW
Modular switches: Anchor or equivalent make
DG BACKUP
3 Bedroom Apartment: 2 KW
2 Bedroom Apartment: 1.5 KW
VERTICAL TRANSPORTATION
Lifts: OTIS / Kone / Johnson or Equivalent
SECURITY SYSTEM & AUTOMATIONS
Provision for CCTV as per design
SUSTAINABILITY
Organic waste converter, Ground water recharging, Rain water storage, Street light, STP & Solar water heater (provided only for top 2 floors)