Structure
R.C.C Framed Structure with Porotherm/Cement block walls.
Flooring & Dado
a. Common Area
Ground floor Entrance : Vitrified flooring
& Lift lobbies
Basement lift lobby : Vitrified tile flooring
Upper floor lift lobbies : Vitrified tile flooring
Staircase : Cement finish / Step tiles
Corridors : Vitrified tile flooring
b. Apartment
Foyer : Vitrified Tiles
Living & Dining : Vitrified Tiles
Master Bedroom : Vitrified Tiles
Other Bedrooms : Vitrified Tiles
Balcony : Anti-skid ceramic tiles
Kitchen : Vitrified tiles
Skirting : Vitrified tiles
Toilet : Ceramic tiles
c. Cladding
Kitchen dado : Ceramic tiles 600 mm above the counter level
Toilet dado : Ceramic tile dado up to 7’ in shower area / Up to 4’ high in rest of the areas
CP & Sanitary fittings
Chromium plated fittings for all toilets
Wall mixer with shower in bath area
Health faucet for all the toilets
EWC for all toilets
Wash basin / Corner wash basins
Kitchen
No kitchen counter, sink & sink mixer shall be provided
(to be installed by end user)
Inlet & Outlet Provision for washing machine. Electrical
provision for geyser in all the toilets
Doors
All door fram
All door shutters- flush shutters with paint finish and
necessary hardware
Windows & Railings
Aluminium / UPVC Sliding Door for Living Room
Aluminium / UPVC Windows ( Bedrooms & Kitchen)
Aluminium / UPVC Ventilators for toilets
Balcony railings in MS
Painting
Exterior walls with weather coat paint as per design
Internal walls and ceilings with oil bound distemper
Enamel paint on all MS railings / grills
Lift
Automatic passenger lifts
Electrical
One TV point in living room
Only conduiting for telephone point in Living room i.e.
without wiring and switch box
Only conduiting for AC in Master bedroom shall be
provided (AC point not in developer scope)
Intercom facility in ground floor of each tower to the
security room
Individual apartments to have a BESCOM power of 2kW for
1BHK and 3kW for 2BHK & 3BHK
Back-up Generator (at extra cost)
0.25kVA for 1BHK, 2BHK and 3BHK