STRUCTURE
RCC framework structure.
FRAME
Superstructure 6” external and 4” internal Solid Cement Block.
PLASTERING
Internal Plastering with Fine finish and External sponge finish.
DOOR
Main Door of teak frame with OST Shutter and all other internal doors sal- wood frames with Water proof laminated/ Equivalent flush shutter.
WINDOWS
UPVC (With 2 track) Windows
FLOORINGS
Double charged Vitrified tiles (2’x2’) in Entire flat and ceramic tiles in balconies & Toilet.
KITCHEN
Cooking platform in polished granite plat form with Stainless steel & 2’ Ceramics tile
TOILETS
Digital glazed wall tiles (18?x12?) with Concealed Flush tank, wall mounted EWC & wash basin with half pedestal with concealed Diverter (Hindware & Jaguar are Equivalent)
PAINTINGS
Putty smooth finish with tractor Emulsion for internal & Apex Emulsion for external and enamel Polish paints for doors and grills & polish finish for Main door.
ELECTRICAL
Concealed copper wiring with modular switches, required number of points
SANITARY & WATER SUPPLY
PVC sanitary pipes and UPVC water pipes etc…
POWER BACK UP
Amps per each apartment and common areas and lifts.